Six stages, in order. Nothing here is unusual — it is the sequence any competent supply and supervision job follows. We set it out plainly so you know what we will ask for and when.
Stage 01
Enquiry
Tell us the location, the storey height, the wall area if you know it, and when you expect to start. Drawings help but are not required at this point — a sketch and a site address are enough to begin. We reply within two working days, and we will tell you at this stage if we think laterite is the wrong answer for your site.
Stage 02
Take-off
We measure quantities from your drawings: brick and block counts by wall type, cement in 50kg bags, pavers by square metre, plus an allowance for cutting and breakage. You get a written schedule with the assumptions listed, so if your design changes you can see exactly which line moves. Pricing is against that schedule, not a round figure.
Stage 03
Sample panel
Before bulk supply we build a small panel — typically a square metre or two — in the actual bond, coursing and mortar you have specified. You approve the colour, the joint and the texture off the panel, and it stays on site as the reference standard for the rest of the build. Disputes about finish are far cheaper to settle at one square metre than at forty.
Stage 04
Supply
Deliveries are phased against your programme rather than dumped in one load, so you are not storing and protecting a full house of brick from day one. Every cement bag carries its batch number and manufacture date. We agree the offloading point and stacking arrangement with your site before the first lorry moves.
Stage 05
Supervision
Our engineer attends at the agreed hold points — set-out, damp-proof course, first lift, ring beam, and as the work proceeds — to check that the material is being laid the way it was tested. Mortar mix, joint thickness, wall protection during curing and rain: these are the details that decide whether the wall performs. Each visit is written up.
Stage 06
Handover
You receive the batch records for what was supplied, the supervision reports, and a short maintenance note covering the things that matter for earth walling: keep water off the base, keep the overhang and gutters clear, and repoint rather than render if a joint opens. We ask permission to photograph the finished building. That is how this page eventually fills up.